_HEIC.png)
JP, Innocent, and our hired contractors.

Concrete Foundation for our 10kL reservoir tank.

The drinking water tap stand.

Rebar grid for our concrete foundation.

Akshaya taking a selfie with the kids of the school.
_HEIC.png)
Akshaya, Alexis, and Phil examining the dimensions of the retaining wall of our 10kL storage tank.
_HEIC.png)
The installed 10kL storage tank (left), and the pre-existing 10kL storage tank (right)

Innocent inspecting our first-flush tank, accompanied by curious teenagers.

Pre-dinner photo with JP and Innocent.

Discussing the timeline of events for Implementation 2 with JP, over breakfast.

Filtration Tank (right) and clean-water tank (left).

Dinner!! Potatoes, greens, peas, ground beef, and rice.

View of the setting sun from our lodging.

Post-dinner photo with Innocent and Bridgitte (Headmistress of the school).

Group Photo with our hired contractors and Bridgitte!!