JP, Innocent, and our hired contractors.

IMG_9720.HEIC

Concrete Foundation for our 10kL reservoir tank.

IMG_0013.HEIC

The drinking water tap stand.

DA4B3719-2E97-4373-9291-67D86698A9B0.jpg

Rebar grid for our concrete foundation.

IMG_9712.HEIC

Akshaya taking a selfie with the kids of the school.

IMG_9811 (1).HEIC

Akshaya, Alexis, and Phil examining the dimensions of the retaining wall of our 10kL storage tank.

IMG_9951 (1).HEIC

The installed 10kL storage tank (left), and the pre-existing 10kL storage tank (right)

IMG_9788.HEIC

Innocent inspecting our first-flush tank, accompanied by curious teenagers.

b96b2f6d-b801-444f-900d-6af1c646c008.jpg

Pre-dinner photo with JP and Innocent.

IMG_9603.jpg

Discussing the timeline of events for Implementation 2 with JP, over breakfast.

IMG_9774.HEIC

Filtration Tank (right) and clean-water tank (left).

IMG_9673.HEIC

Dinner!! Potatoes, greens, peas, ground beef, and rice. 

IMG_9844.HEIC

View of the setting sun from our lodging.

IMG_5981.jpg

Post-dinner photo with Innocent and Bridgitte (Headmistress of the school).

IMG_6038.HEIC

Group Photo with our hired contractors and Bridgitte!!